The SIG Solar III solar power plant: one of the largest in Switzerland
 

6,000: this is the impressive number of Solar III photovoltaic panels!

Built near the Verbois Dam, the power plant has been integrated into the site in a way that is environmentally friendly.

Why not come and pay it a visit!

History

When commissioned in 2005, Solar III was the largest solar power plant in Switzerland. It was installed on a plot of land that was freed up following the renewal of the electrical transformer substation at the Verbois Dam. During its integration into the site, SIG made sure to create special areas for the conservation of the location’s flora and fauna.

Key figures

  • 1 MW of total energy

  • 16'000 m2 of land with installed panels, or the entire area of two football fields

  • 1 GWh produced annually

  • 300 Geneva households whose consumption is covered by this production

Tour information

 

 

Target audience

 

These guided tours are suitable for companies, schools, organisations and public bodies.

They are organised for groups from 10 people minimum to 19 maximum. Recommended age: from 10 years old.

Please note: Visits are unsuitable for persons with reduced mobility.

 

Tour information

 

From Monday to Friday from 9 a.m. to 4 p.m. (last tour).

Tour combined with the Verbois Dam.

Duration: 1.5 hours

Languages: French, English

 

Pricing

 

Tours are free for schools, organisations and public bodies.

For companies, the price is CHF 300 per guide (19 people).

Registration is required

 

Registration information

 

Once you have filled out our form, you will receive a confirmation e-mail.

For more information, contact us via visites.sites@sig-ge.ch, or at 022 420 85 81.

 

Read the visiting rules 

 

In view of the high number of local requests that we receive, we would like to inform you that we can no longer welcome visitors from regions other than Switzerland or “Greater Geneva”.

Thank you for your understanding.

 